About RAMPCO     |     Our Operations
 
 Water Tube Boilers for MORVARID Petrochemical Complex


Client: Morvarid Petrochemical Co.

Project duration: 8 months

Boiler Type: O-type

Scope of Supply:

Two (2) 30TPH +One (1) 60TPH Water tube Boiler - 6 Drums

Burner*4

Control System*1

Deaerator*3

Super heater*3

Economizer*3

Stack*3

BFW Pump*7

 

 

 

Contact              Work with RAMPCO

All Rights reserved © RampcoGroup
RampcoGroup.com